About project
CLINIC FOR PULMONARY DISEASES SARAJEVO
Address: Bardakčije 90, Sarajevo
Heated area: 3,796 m2
Energy efficiency measures:
- Thermal insulation of the external walls;
- Thermal insulation of the ceiling below the pitched roof;
- Windows and doors replacement;
- Partial replacement of the Lighting Fixtures
- Heat Meter Installation
- Temperature and Humidity Sensor Installation
- Remote data reading system instalation
Total investments (BAM with VAT): 474,796.45
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 36,341,3
Total energy savings (thermal and electrical): 333,209 kWh/year
CO2 emissions: 78,4 tCO2/year
Start of works: 27/01/2022
Works completed/Date of technical acceptance: 08/09/2022