Navigation

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 3

About project

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 3

Kralja Tvrtka b.b., Mostar

Heated Area: 3,597.47 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling towards the unheated attic;
  • Replacement of existing joinery and/or metalwork;
  • Replacement of boiler and energy source;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Replacement of asbestos cement roof panels with the new cover made of a steel sheet;

Total investments (BAM with VAT): 691,342.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 145,324.36
Total energy savings (thermal and electrical): 571,464 kWh/year
CO2 emissions: 125 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano