Primary school “Drvar”

PRIMARY SCHOOL “DRVAR” 

 

Drvar

 

Area: 5.893 m2

 

Energy Efficiency measures:

  • Thermal insulation of the ceiling
  • Thermostatic valves
  • Energy management team

 

Estimated investment for energy efficiency measures: 122.999 BAM

 

Estimated savings in energy costs after the implementation of schemes (BAM with VAT):