JZU UKC TUZLA – Clinic for internal diseases

JZU UKC TUZLA – Clinic for internal diseases

Address: Trnovac bb

Heated area: 9.716,96 m2


Energy efficiency measures:

  • Thermal insulation of facade walls
  • Replacement of existing carpentry
  • Partial replacement of lighting fixtures


Total investments (BAM with VAT): 1.635.111,65

Total energy savings (thermal and electrical): kWh/year

JZU UKC TUZLA – Clinic for internal diseasesCO2 emissions:  tCO2/year

Start of works: 21/11/2023

Public Health Institution University Clinical Center Tuzla – Clinic for Laboratory Diagnostics, Tuzla

PUBLIC HEALTH INSTITUTION UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR LABORATORY DIAGNOSTICS, TUZLA

Address: Trnovac b.b, Tuzla

Heated area: 2,486 m2


Energy efficiency measures:

  • Thermal insulation of the ceiling towards the unheated attic;
  • Partial replacement of lighting fixture;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 127,337.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,162.70
Total energy savings (thermal and electrical): 132,534 kWh/year
CO2 emissions: 51 tCO2 /year
Start of works: 15/09/2021
Works completed/Date of technical acceptance: 19/03/2022

Public Health Institution University Clinical Center Tuzla – Clinic for Pulmonary Diseases, Tuzla

PUBLIC HEALTH INSTITUTION UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR PULMONARY DISEASES, TUZLA

Address: Slavinovići b.b. Tuzla

Heated area: 3,842.62 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the ceiling towards the unheated attic;
  • Thermal insulation of the unheated basement ceiling;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 757,619.79
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 40,705
Total energy savings (thermal and electrical): 471,777 kWh/year
CO2 emissions: 155 tCO2 /year
Start of works: 15/09/2021
Works completed/Date of technical acceptance: 19/03/2022