Psychiatric Clinic of the University Clinical Hospital

PSYCHIATRIC CLINIC OF THE UNIVERSITY CLINICAL HOSPITAL

Address: Kneza Mihajla Viševića Humskog 39, Mostar

Area: 4,256 m2


Energy efficiency measures:

 
  • Thermal insulation of facade and the roof
  • Replacement of facade openings
  • Installation of equipment for measuring energy consumption
  • Installation of temperature and humidity monitoring equipment

Total investments (BAM with VAT): 809,352.62
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 102,470
Total energy savings (thermal and electrical): 503,455.00 kWh/year
CO2 emissions: 147 tCO2/year
Works completed: 06/2016

Clinical Centre of the University of Sarajevo – Clinic for orthopedics and traumatology

CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO – CLINIC FOR ORTHOPEDICS AND TRAUMATOLOGY

Address: Bolnička 25, Sarajevo

Heated area: 7,382 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,257.394,21 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 110,075 
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 167 tCO2 /year
Works completed: 07/2016

University Clinical Center Tuzla – Clinic for Surgical Branches Tuzla

UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR SURGICAL BRANCHES TUZLA

Address: Rate Dugonjića bb, Tuzla

Heated area: 11,450 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade
  • Replacement of external joinery
  • Regulation of the heating system by means of three-way valves
  • Installation of equipment for measuring energy consumption, as well as equipment for monitoring temperature and humidity

Total investments (BAM with VAT): 1,037,923.25
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 126,861
Total energy savings (thermal and electrical): 1,822.604.00 kWh/year
CO2 emissions: 285 tCO2 /year
Works completed: 06/2016