Heated area: 5,893 m2


Energy efficiency measures:

 

  • Renovation of the roof structure of the gymnasium and locker room area, and installation of a roof covering made of thermal panels;
  • Thermal insulation of the ceiling above the heated area of the old and new school;
  • Replacement of the facade openings of the gymnasium, locker room area and boiler room;
  • Installation of dynamic thermostatic valves;
  • Improvement of the heating system;

Total investments (BAM with VAT): 180,067.96 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 7,640.00
Total energy savings (thermal and electrical): 127,215 kWh/year
CO2 emissions: 3 tCO2 /year
Works completed: 09/2020

Primary school “Drvar”

PRIMARY SCHOOL “DRVAR” 

 

Drvar

 

Area: 5.893 m2

 

Energy Efficiency measures:

  • Thermal insulation of the ceiling
  • Thermostatic valves
  • Energy management team

 

Estimated investment for energy efficiency measures: 122.999 BAM

 

Estimated savings in energy costs after the implementation of schemes (BAM with VAT):

Cantonal Hospital “Fra Mihovil Sučić”

CANTONAL HOSPITAL FRA MIHOVIL SUČIĆ

Address: Svetog Ive 2, Livno

Heated area: 5,530 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Partial restoration of the roof;
  • Installation of a system of solar collectors for PTV;
  • Thermal insulation of internal walls towards unheated space;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Improvement of the reactive component electricity consumption system, i.e. installation of the electrical energy compensation circuit;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 496,308.17 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,746
Total energy savings (thermal and electrical): 556,569.00 kWh/year
CO2 emissions: 30 tCO2 /year
Works completed: 03/2018

Health Centre Tomislavgrad

HEALTH CENTRE TOMISLAVGRAD

Address: Mije Ferića bb, Tomislavgrad

Heated area: 4,921 m2


Energy efficiency measures:

 

  • Thermal insulation of façade
  • Replacement of existing joinery and/or hardware
  • Ceiling insulation
  • Replacement of existing incandescent bulbs with energy-saving light bulbs
  • Installation of two pellet boilers
  • Installation of equipment for measuring energy consumption and for monitoring temperature and humidity

Total investments (BAM with VAT): 357,545.25 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,393 
Total energy savings (thermal and electrical): 543,789 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 04/2018