PRISON IGMAN
Address: Branilaca Sarajeva 8, Sarajevo
Heated area: 498 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Replacement of facade openings;
- Thermal insulation of the ceiling towards the attic;
- Installation of dynamic thermostatic radiator valves;
- Installation of new pellet boilers;
- Automatic regulation for the heating system;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 159,361.27
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 23,860
Total energy savings (thermal and electrical): 129.050,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 03/2018