Prison Igman

PRISON IGMAN

Address: Branilaca Sarajeva 8, Sarajevo

Heated area: 498 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of new pellet boilers;
  • Automatic regulation for the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 159,361.27
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 23,860
Total energy savings (thermal and electrical): 129.050,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 03/2018

Public Institution Pazarić Institute – Pavilion 8

PUBLIC INSTITUTION PAZARIĆ INSTITUTE – PAVILION 8

Address: Pazarić Resnik, 71243 Pazarić

Heated area: 1,317 m2


Energy efficiency measures:

 

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 212,276.55
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 10,029
Total energy savings (thermal and electrical): 128,190.00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary fuel for heating)
Works completed: 03/2018

Prison Bihać

PRISON BIHAĆ

Address: Rasima Delića bb 77000 Bihać

Heated area: 1,098 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of a new pellet boiler;
  • Connection of the administrative building to the new boiler room;
  • Installation of external LED reflectors;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 284,128.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,962
Total energy savings (thermal and electrical): 162.714,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the energy renovation, the energy source was replaced with biomass)
Works completed: 03/2018

Federal Ministry of Finance

FEDERAL MINISTRY OF FINANCE

Address: Mehmeda Spahe 5, 71000 Sarajevo

Heated area: 3,155 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 465,018.37
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,167
Total energy savings (thermal and electrical): 393,528.00 kWh/year
CO2 emissions: 50 tCO2 /year
Works completed: 07/2018

Police Academy – Building A

POLICE ACADEMY – BUILDING A

Address: Dobojska 32, 71000 Sarajevo

Heated area: 1,260 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 201,463.31
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,734
Total energy savings (thermal and electrical): 113,865.00 kWh/year
CO2 emissions: 19 tCO2 /year
Works completed: 03/2018