About project
COMBINED SECONDARY SCHOOL STJEPAN RADIĆ, USORA
Address: Žabljak bb, Usora
Heated area: 2,162 m2
Energy efficiency measures:
- Replacement of boiler plant;
- Replacement of the part of the pipeline distribution system and radiator bodies (331 articles);
- Installation of daylight and movement sensors on the lighting system;
- Installation of dynamic thermostatic radiator valves;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 82,712.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 14,532
Total energy savings (thermal and electrical): 20,596.00 kWh/year
CO2 emissions: 34 tCO2 /year
Works completed: 05/2019