SECONDARY SCHOOL JABLANICA

Address: Zlatnih ljiljana br.4, Jablanica

Area: 2,011 m2


Energy efficiency measures:



  • Thermal insulation of facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Renovation of the roof structure and replacement of the roof covering;
  • Partial replacement of lighting fixtures with more energy efficient; ones;
  • Replacement of energy source;
  • Installation of the new pellet boiler;
  • Adaptation of the existing boiler room for new needs;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Improvement of the central heating system;

Total investments (BAM with VAT): 488,456.20 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 24,379 
Total energy savings (thermal and electrical): 118,955.00 kWh/year
CO2 emissions: 50 tCO2/year
Works completed: 7/2018

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano