PUBLIC INSTITUTION FOURTH ELEMENTARY SCHOOL MOSTAR
Address: Salke Šestića 23, Mostar
Area: 4,230 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Rehabilitation and thermal insulation of flat and sloping roofs;
- Replacement of facade openings;
- Installation of the new pellet boiler;
- Installation of dynamic thermostatic radiator valves;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 761,531.60
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 99,757
Total energy savings (thermal and electrical): 323,097.00 kWh/year
CO2 emissions: 111 tCO2 /year
Works completed: 12/2016