Mixed Industrial High School Zenica

About project

MIXED INDUSTRIAL HIGH SCHOOL ZENICA


Address: Bulevar Kralja Tvrtka I, Zenica


Heated area: 3,514 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Roof thermal insulation;
  • Replacement of existing carpentry / locksmith;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 783,619

Total energy savings (thermal and electrical): 541,150 kWh/year
CO2 emissions: 158,6 tCO2/year
Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano