About project
URGENT MEDICINE CLINIC SARAJEVO
Address: Bolnička 25, Sarajevo
Heated area: 8,481,89 m2
Energy efficiency measures:
- Thermal insulation of the external walls;
- Windows and doors replacement;
- Thermal insulation of the flat roof;
- Installation of thermostatic valves;
- Heat Pumps Installation
- Heat Meter Installation
- Temperature and Humidity Sensor Installation
- Remote data reading system instalation
Total investments (BAM with VAT): 2,382,029.15
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 192,918.9
Total energy savings (thermal and electrical):1,369,670.00 kWh/yr
CO2 emissions: 275,0 tCO2/yr
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 29/11/2022