Public Institution Elementary School “Rešad Kadić” Kakanj

About project

PUBLIC INSTITUTION ELEMENTARY SCHOOL REŠAD KADIĆ KAKANJ

Address: Gradac br. 240, Brnjic, Kakanj

Heated area: 1,626.90 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing carpentry and/or locksmithing;
  • Thermal insulation of the ceiling above the heated space;
  • Thermal insulation of the roof;
  • Replacement of asbestos cover;
  • Installation of thermal energy meters;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 238,940.36
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,120
Total energy savings (thermal and electrical): 251,555 kWh/year
CO2 emissions: 78 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano