PUBLIC INSTITUTION MEDICAL SCHOOL ZENICA

Address: Crkvenice bb, Zenica

Heated area: 3,447.95 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of a flat roof;
  • Thermal insulation of the ceiling;
  • Partial replacement of lighting fixtures;
  • Installation of dynamic thermostatic valves;
  • Installation of automatic regulation of the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 617,777.88
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 117,749
Total energy savings (thermal and electrical): 733,698 kWh/year
CO2 emissions: 250 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano