About project
PUBLIC INSTITUTION MEDICAL SCHOOL ZENICA
Address: Crkvenice bb, Zenica
Heated area: 3,447.95 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Replacement of existing joinery/metalwork;
- Thermal insulation of a flat roof;
- Thermal insulation of the ceiling;
- Partial replacement of lighting fixtures;
- Installation of dynamic thermostatic valves;
- Installation of automatic regulation of the heating system;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 617,777.88
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 117,749
Total energy savings (thermal and electrical): 733,698 kWh/year
CO2 emissions: 250 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022